Why backup power gets a serious look in Dallas
Two recent events changed how many North Texas owners think about outages. In February 2021, winter storms pushed the state grid past its limits and more than 4.5 million Texas homes and businesses lost power, some for several days, according to the record of the 2021 Texas power crisis. Then in late May 2024, a storm with winds near 80 mph knocked out more than 650,000 Oncor customers, and close to 150,000 were still waiting two days later.
The 2021 event also showed that outages are not always short or local. Rotating outages started in the early hours of February 15, and the crisis stretched on for days while gas supply problems hit the power plants themselves. Many owners came out of that week asking the same question: what would it take to keep the heat, the fridge and the business running next time?
A portable unit and an extension cord can keep a freezer cold. It will not run central air, a home office or a restaurant walk-in. That is the job of a standby generator, wired through a transfer switch and fed by your existing natural gas line or a propane tank. It also runs outdoors on a fixed pad, so no one has to drag a gas can through an ice storm or run a cord through a cracked window.
Generator services we can match you with
Every request goes to an independent pro. These are the five kinds of work people ask us about most.
Whole-home standby generators
A permanently installed unit, usually on natural gas, sized to carry the house: HVAC, kitchen, water heater, garage door and the rest. Cost guides list whole-house units at 22 kW and up. Read more on whole home standby generators, including what the install day looks like.
Commercial generator installation
Offices, medical suites, restaurants and server rooms need backup that fits the building, the code and the budget. Commercial jobs in Dallas go through plan review with drawings, a load analysis and transfer equipment specs. See commercial generator installation for what owners and managers should prepare.
Repair and annual maintenance
A generator that has sat for a year can fail on the one day it matters. Dead batteries, old oil, clogged air filters and worn spark plugs are common causes. The generator repair and maintenance page covers annual service and what a failed start usually means.
Sizing and load calculation
Square footage is a rough guide at best. The right size comes from what you want running at the same moment, plus the surge your air conditioner pulls when it starts. Our generator sizing guide walks through the math a pro will use.
Transfer switch installation
The transfer switch is the part that keeps generator power off the utility lines and flips your load over without you touching anything. Some owners also add a switch for an existing portable unit. See transfer switch installation.
What generator installation costs
Prices below come from national cost guides. A Dallas quote can land above or below them, and the real number comes only after a pro sees your panel, gas meter and yard.
| Item | Range reported | Where the figure comes from |
|---|---|---|
| Partial-home standby unit (9 to 20 kW) | $2,000 to $6,300 | Angi |
| Whole-house standby unit (22 to 48 kW) | $5,000 to $18,000 | Angi |
| Installation labor | $1,500 to $5,000 | Angi |
| Automatic transfer switch, installed | $600 to $2,500 | HomeGuide |
| Fuel connection | $500 to $2,000 | PowerOutage.us |
| Permits and inspections | $50 to $500 | Angi, PowerOutage.us |
| Annual maintenance visit | $172 to $395 | Angi |
Generac's own guide puts a typical home standby project at $8,000 to $16,000 with the unit included. For the full breakdown, see generator installation cost.
How it works
- Use the form. Give your ZIP code, the type of property, the fuel you have and what you want to keep running.
- We match you with a pro. Your request goes to an independent, licensed electrical contractor who installs generators in your part of Dallas County.
- The pro looks on site. Expect a walk around the panel, the gas meter, the yard and any HOA rules.
- You get a written quote. It should name the unit, the transfer switch, the gas work, the pad and the permits.
- You decide. Hire the pro, ask questions, get other bids or walk away.
What to have ready before the site visit
A good quote depends on good information. Before the pro arrives, it helps to know:
- Your fuel. Check whether the house or building has a natural gas meter. If not, the pro will talk about propane.
- Your must-run list. The fridge and lights only, or the whole panel including every AC system?
- Your panel. Its age, its amperage if the label shows it, and whether any breakers are open.
- Your rules. HOA guidelines on equipment and screening, and any lot easements shown on your survey.
- Your timing. A firm deadline, such as before winter, changes how a pro schedules permits and gas work.
Where we serve
Requests come from across Dallas and the suburbs around it. The full list is on our service areas page. A few places we hear from often: Preston Hollow, Lake Highlands, Richardson, Garland, Plano and Irving.
Why use a referral service
We are honest about what we are. Outage Ready does not install, sell or service generators, and we are not a dealer for any manufacturer. We pass your request to an independent pro and may be paid by that pro for the referral. That costs you nothing.
What you get is one short form instead of hunting through listings. What you keep is the decision. Check the license, ask for proof of insurance and compare at least one other bid if you like.
Generator questions
Do I need a permit to put in a standby generator in Dallas?
Plan on it. Permanent generators involve electrical work and, on natural gas, gas piping. The City of Dallas generator checklist calls for a separate plumbing permit on natural gas units, and it says a home generator cannot sit in a required side yard or an easement. Confirm in your quote who pulls each permit.
Are you a Generac dealer?
No. We are not a dealer or authorized agent for any brand. The independent pros we refer install Generac and other brands, and they can explain why they suggest one unit over another for your home or building.
How long does a home generator install take?
The hands-on work usually takes hours, not days. The wait before it is longer. Permits, gas line work, pad prep and the installer's schedule can stretch the lead time to several weeks, so asking before storm season helps.
Will a standby generator run my central air in July?
It can if it is sized for it. A 3-ton central air system typically draws about 3.5 to 5 kW while running and much more for a moment when it starts. A pro adds that starting surge to the rest of your load before picking a size.
Where on my lot will the generator go?
Usually on a stable, well-drained spot near the gas meter and the electric meter, which keeps pipe and wire runs short. It also has to meet the maker's clearance rules and stay away from windows, doors and vents because of exhaust.
What fuel do Dallas standby generators use?
Most home units here connect to the natural gas line the house already has. Propane is the usual choice where there is no gas service. Larger commercial units often run on diesel, which needs a fuel tank on site.
How much does yearly generator service cost?
Angi reports a typical maintenance visit at $172 to $395, with about $200 to $600 a year in total upkeep. The visit covers oil, filters, spark plugs, the battery and a test run under the transfer switch.
Who actually does the installation work?
An independent electrical contractor. In Texas, electrical work must be done by a licensed person working through a licensed electrical contractor, and gas piping falls under the state plumbing license law. Ask the pro for license numbers and look them up before you sign.